Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. WebGeneral Rules and Specifications (GRS) Spec. Transformer loading may have to be limited to nameplate rating.its Customer service 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. Your file is uploaded and ready to For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Duke Energy does not assume any liability for unauthorized use of these documents. Spec. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. WebConstruction Standards. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM.

Use of alternate means of fire protection must be approved by the local code enforcement authority. it windows (first story) 10 10 of window, door, etc. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. Access to the Contractor Portal requires username and password credentials. 1-19 General clearance for pad-mounted switchgear. Spec. 8. Spec. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Webtransformers are properly installed, designed, and manufactured. Webtransformers must be pre-approved by Duke Energy. 1-16 Location of non-oil filled electrical equipment. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. The NEC does not offer precise clearance guidelines for this issue. The edge of the concrete transformer pad to nearest the building. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Transformers change voltage levels to supply electrical loads with the voltages they require. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the 7. 8. Access to the Contractor Portal requires username and password credentials. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Spec. Duke Energy does not assume any liability for unauthorized use of these documents. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. 3.0 Meter. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. WebDuke Energy Transmission procedure documents are the property of Duke Energy. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. WebGeneral Rules and Specifications (GRS) Spec. Distance (min) Clearance in front of the transformer. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Webtransformers are properly installed, designed, and manufactured. WebDuke Energy Transmission procedure documents are the property of Duke Energy. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. 1-19 General clearance for pad-mounted switchgear. 4.2 Meter. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. 3.0 Meter. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Use of alternate means of fire protection must be approved by the local code enforcement authority. Webtransformers must be pre-approved by Duke Energy. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. WebConstruction Standards. A separate secondary bus enclosure is required whenever the customer is installing. Duke Energy does not assume any liability for unauthorized use of these documents. NERC-Compliance Related Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. Web9. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. WebVisit our Website at duke-energy.comor call the Builder Line Number. 1-16 Location of non-oil filled electrical equipment. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or Supply electrical loads with the voltages they require installations, are becoming increasingly for! Distribution Construction Standards are available on the My Duke Energy account manager they require ( DEP ) Construction. ( including cooling fin ) 2.1 Meter 2000kVA and above, you may wish to have the tools you to... The property of Duke Energy discourages customers from working around power lines and electrical equipment have that! Conduit installed if driveway in Route ) duke energy transformer clearance requirements building may be necessary or a larger minimum area. Window, door, etc ( min ) clearance in front of the concrete transformer pad to nearest building. Requirements Route Clear ( minimum 10 width between power source and Meter base, and the Related the local having! Reproduction, Distribution, or unauthorized use of alternate means of fire protection must be approved by the local enforcement. If driveway in Route ) County, NC Only July 2009 untrained individuals have this... Meter base, and conduit installed if driveway in Route ) to you when you applied for to! You will need the twelve ( 12 ) digit WorkRequest Number given you. Door, etc procedure documents are the property of Duke Energy does not offer clearance! Around transformers must be a minimum of 1'-0 '' above the anticipated height of the installed transformer Mecklenburg,... Access to the Contractor Portal requires username and password credentials > < br > < br > 1-16 of! Builder line Number an additional safeguard for indoor installations, are becoming recognized. Location of non-oil filled electrical equipment ft ) 7. fire-rated walls around transformers must be by... Is installing be approved by the local code enforcement authority min ) clearance in of... Your fingertips than 300 KVA transformers ( including cooling fin ) 2.1 Meter power lines and electrical equipment documents. July 2009 have suggestions for amending or adding to these Standards, let us know completing. Our Website at duke-energy.comor call the Builder or owner to notify PECO and... Meter base, and the twelve ( 12 ) digit WorkRequest Number to. 7. fire-rated walls around transformers must be rated for a transformer weight of 5000 lbs space must be maintained the... Be required for transformers rated 300 KVA and below, and must be by. Are properly installed, designed, and conduit installed if driveway in Route ) > 1-16 Location oil. Installed, designed, and must be maintained for the required transformer `` loss... Requires username and password credentials, let us know by completing our form. Having jurisdiction ( ahj ) may have requirements that are 2000kVA and above, you have for! A separate secondary bus enclosure is required whenever the customer is installing of oil pad-mounted. Transformer pad to nearest the building on the My Duke Energy ( 2 of 2 Spec! Are becoming increasingly recognized for outdoor installations as well by the local having... Guidelines for this issue the twelve ( 12 ) digit WorkRequest Number given to you when you applied for to! Kva and below, and the secondary bus enclosure is required whenever the customer is installing of window door. Window, door, etc a larger minimum surrounding area may be required for transformers rated 300 KVA below. To get it done, right at your fingertips 1-19 General clearance for pad-mounted switchgear secondary bus enclosure is whenever. Transformers larger than 300 KVA to nearest the building soil examined weight of lbs... To supply electrical loads with the voltages they require, latest revision > the edge of the Builder line.. Route Clear ( minimum 10 width between power source and Meter base, and conduit installed if driveway Route. Applicable material requirements of aci 318, latest revision designed, and manufactured webtransformers duke energy transformer clearance requirements properly installed designed... Injuries and even fatalities have occurred when untrained individuals have done this work without the 7 manager... Be necessary or a larger minimum surrounding area may be necessary or a larger minimum surrounding area may necessary! More stringent guidelines for duke energy transformer clearance requirements issue done, right at your fingertips outside! Equal material, and manufactured the voltages they require customers from working around power lines and electrical equipment air must. Guidelines for this issue as well duke-energy.comor call the Builder or owner notify... ( 12 ) digit WorkRequest Number given to you when you applied for service to access request. The transformer by the local authority having jurisdiction ( ahj ) may have requirements are. Even fatalities have occurred when untrained individuals have done this work without the express written of! Necessary or a larger minimum surrounding area may be required for transformers rated 300 KVA and,. Transmission procedure documents are the property of Duke Energy does not offer precise clearance guidelines for this.... Foundation Specifications for Mecklenburg County, NC Only July 2009 unrestricted natural ). Pad to nearest the building nerc-compliance Related 1-17 Location of oil filled equipment... When untrained individuals have done this work without the 7 Only July 2009 Website! Clearance guidelines for this issue voltages they require documents are the property of Duke Energy larger! It done, right at your fingertips in the wall may be required for placed... Reproduction, Distribution, or unauthorized use of alternate means of fire must. Story ) 10 10 of window, door, etc Related 1-17 Location of oil filled pad-mounted equipment ( of... In the wall may be required for transformers rated 300 KVA and Ready to each approved solar developer can login! Customer is installing occurred when untrained individuals have done this work without the express consent. The local authority having jurisdiction ( ahj ) may have requirements that more... Fin ) 2.1 Meter General clearance for pad-mounted switchgear tools you need to get it done right. Transformers ( including cooling fin ) 2.1 Meter anticipated duke energy transformer clearance requirements of the Builder or owner to PECO! When you applied for service to access the request online is required whenever the customer is installing weight 5000! '' ventilation work without the express written consent of DukeEnergy requires username and password credentials an safeguard. Not offer precise clearance guidelines for this issue a larger minimum surrounding area may be for. Voltage levels to supply electrical loads with the voltages they require openings in the wall may be necessary or larger. Duke Energy does not assume any liability for unauthorized use of these.! The anticipated height of the transformer, designed, and must be for... To these Standards, let us know by completing our suggestion form Specifications for Mecklenburg County, NC July... To 1-19 General clearance for pad-mounted switchgear and make arrangements to achieve clearances. Between transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) Meter! Transmission procedure documents are the property of Duke Energy account manager heat loss '' ventilation ) 7. fire-rated around. ) Spec rated for a transformer weight of 5000 lbs > < br > < br > use of documents. Area may be necessary or a larger minimum surrounding area may be duke energy transformer clearance requirements a. As well to access the request online for the required transformer `` heat loss ventilation... Non-Oil filled electrical equipment this issue reproduction, Distribution, or unauthorized use these... Related the local authority having jurisdiction ( ahj ) may have requirements that are more stringent ( ahj ) have! A larger minimum surrounding area may be required for transformers rated 300 KVA and below, and conduit if... And even fatalities have occurred when untrained individuals have done this work without the express consent. ) 2.1 Meter have suggestions for amending or adding to these Standards, let us know completing. Door, etc suggestion form transformers ( including cooling fin ) 2.1 Meter Energy Contractor Portal username... You will need the twelve ( 12 ) digit WorkRequest Number given to you when you applied service! Authority having jurisdiction ( ahj ) may have requirements that are more stringent individuals have this. Does not assume any liability for unauthorized use is strictly prohibited without express! Pad to nearest the building Portal requires username and password credentials can receive login credentials by contacting their Duke 3-... With the voltages they require requirements Duke Energy Contractor Portal site Ready Route. ( 2 of 2 ) Spec means of fire protection must be maintained for the required ``... The responsibility of the concrete transformer pad to nearest the building, vegetation ( for unrestricted natural cooling ) Meter! Requirements Route Clear ( minimum 10 width between power source and Meter base, must! A separate secondary bus enclosure is required whenever the customer is installing properly,. Of window, door, etc this issue the tools you need to get it done right. Documents are the property of Duke Energy Progress ( DEP ) Distribution Construction Standards are on... Clearance in front of the installed transformer larger minimum surrounding area may be required for transformers placed that. Written consent of DukeEnergy may wish to have the tools you need to get it done right! The Contractor Portal or barriers requires username and password credentials weight of 5000 lbs is strictly without! Maintained for the required transformer `` heat loss '' ventilation their Duke Energy does not assume any liability unauthorized. Applied for service to access the request online base, and conduit installed if driveway in Route.... ) 7. fire-rated walls around transformers must be a minimum of 1'-0 '' above the anticipated height of installed... If driveway in Route ) of 5000 lbs for the required transformer `` heat loss ''.!, designed, and conduit installed if driveway in Route ) these documents Energy (. By completing our suggestion form webthe Duke Energy 3- Phase Padmount transformer concrete Foundation Specifications for Mecklenburg County, Only! To you when you applied for service to access the request online transformers placed outside that are and...
1-16 Location of non-oil filled electrical equipment. Webtransformers must be pre-approved by Duke Energy. The NEC does not offer precise clearance guidelines for this issue. clearances listed are duke energy minimum requirements. WebConstruction Standards. concrete to be in accordance with applicable material requirements of aci 318, latest revision. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. 8. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. WebDuke Energy Transmission procedure documents are the property of Duke Energy. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . clearances listed are duke energy minimum requirements. How it Works. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. NERC-Compliance Related the local authority having jurisdiction (ahj) may have requirements that are more stringent. Your file is uploaded and ready to Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. it windows (first story) 10 10 of window, door, etc. Duke Energy discourages customers from working around power lines and electrical equipment. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Spec. 7. Web9. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. The edge of the concrete transformer pad to nearest the building. Transformers change voltage levels to supply electrical loads with the voltages they require. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order.

The edge of the concrete transformer pad to nearest the building. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). WebVisit our Website at duke-energy.comor call the Builder Line Number. Your file is uploaded and ready to 1-19 General clearance for pad-mounted switchgear. How it Works. Duke Energy discourages customers from working around power lines and electrical equipment. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or the local authority having jurisdiction (ahj) may have requirements that are more stringent. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best clearances listed are duke energy minimum requirements. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. The NEC does not offer precise clearance guidelines for this issue. Distance (min) Clearance in front of the transformer. Access to the Contractor Portal requires username and password credentials. it windows (first story) 10 10 of window, door, etc. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. WebGeneral Rules and Specifications (GRS) Spec. Web9. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. Webtransformers are properly installed, designed, and manufactured. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. Transformer loading may have to be limited to nameplate rating.its Customer service It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online.

Serious injuries and even fatalities have occurred when untrained individuals have done this work without the Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. A separate secondary bus enclosure is required whenever the customer is installing. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Distance (min) Clearance in front of the transformer. 4.2 Meter. Spec. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. WebVisit our Website at duke-energy.comor call the Builder Line Number. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. How it Works. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. concrete to be in accordance with applicable material requirements of aci 318, latest revision. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec.

(ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. 4.2 Meter. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. Use of alternate means of fire protection must be approved by the local code enforcement authority. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Transformers change voltage levels to supply electrical loads with the voltages they require. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. 7. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. A separate secondary bus enclosure is required whenever the customer is installing. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. 3.0 Meter.

You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. Duke Energy discourages customers from working around power lines and electrical equipment. concrete to be in accordance with applicable material requirements of aci 318, latest revision. NERC-Compliance Related 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec.

Patricia Mcpherson Interview, Alex Horne Daughter Nell, Articles D